Built for 21st century learning.

Indicative Space Plan

The floorplates can be fitted out to deliver a variety of cutting edge contemporary learning environments. Equally, they are capable of accommodating a high density of students and faculty workers.

1

Lecture Theatre (60 person)

2

Private Study area

3

Staff Area

4

Tea Point

5

Remote Learning

6

Remote Learning Suite

7

Library / Breakout Area

8

Teaching Room (36 person)

9

Cafe Lounge

10

Cafe / Bar

11

Student Reception

12

Booths

13

Enterprise Area

14

Informal Workspace

15

Meeting Room

16

Lobby Area

17

Lifts

18

WCs

Schedule Of Areas & Availability

Existing Pre-lets

The first pillars of The Amp revolution have already been established

The Amp’s first two occupiers will open the doors of their self-contained London HQs from September 2023.

Confetti social space, artist’s impression

Confetti social space, artist’s impression

Confetti Institute of Creative Technologies, part of Nottingham Trent University

Modern University of the Year by The Times and The Sunday Times Good University Guide 2023.

Own dedicated entrance

Space across three floors

600-capacity multi-purpose venue for live music, entertainment, virtual production and eSports

Specialist studios and teaching spaces

Degrees for undergraduate and postgraduate

Home and international students

Delivering hands-on degree in performance, production and business for the music industries; event management and production; content creation; virtual production; eSports production.

The UK’s largest independent training provider, Access Creative College (ACC) has decades of success and experience educating creatives within London and nationally:

Exclusive entrance

Dedicated eSports classroom, complete with competition wings

A multi-functional event venue

A live music suite filled with innovative recording studios, rehearsal rooms and production pods

Bespoke ‘Super Space’ classrooms, designed to bring the professional world into the classroom environment

A wide range of creative courses and apprenticeships for 16-18 and 19+ age groups across eSports, computing, games, media and music

Rich partnerships with London’s foremost creative industry organisations.

Facilities will mirror those at Confetti Nottingham

Facilities will mirror those at Confetti Nottingham

Phase 2: for the daydreamers,

pipedreamers and visionaries.

Hawkins\Brown

 

 

The Future

Phase 1 of The Amp has been focused on repurposing a forgotten asset into a dynamic cutting-edge learning environment for the talent of the future.

With pre-lets already in place, ambitious plans are now underway for Phase 2: the creation of a purpose build multifaceted events space which can provide further dedicated teaching, performance and learning zones.

Hawkins\Brown

Building specification

Reception

Terrazzo tile flooring

Contemporary reception and café space providing break out areas for students and guests

Feature lighting to the ceiling to provide visual draw to café reception area. Lighting to be provided in line with Cat A areas, standard linears as per contract layout.

Cat A areas, standard linears as per contract layout.

Private Rooftop Terrace available to let

4,790 ft2 external roof top amenity space providing opportunities for collaboration, yoga, reflection and meetings

1,820 ft2 internal event space / cafe

Covered external areas provide protection from the elements and shade in the summer

Planters and landscaping design throughout the terrace

Office Specification

“Excellent” BREEAM rating

EPC rating B

WELL ready

New double-glazed windows

Openable windows installed to all floors providing mixed mode ventilation

Floors

Floors are to be locally cleaned and repaired where necessary, prior to the installation of any tenant floor coverings

The design has been progressed typical on a uniformly distributed live load of 3.0kN/m2

Ceilings

Exposed concrete ceiling, cleaned and spray painted with white masonry paint

MEP services will be “exposed” and no suspended ceilings are to be provided

Slab to slab is 3000mm and underside of services (lights) is 2500mm from SSL

Occupancy

1 person per 10m2 NIA HVAC provision

1 person per 5m2 maximum permitted density in accordance with fire strategy

Internal Specification

Structural floor to structural soffit 3000mm

Structural floor to underside of services 2500mm

Structural columns and soffit concrete painted white

Structural column grid 6m x 7m (south block) and 7m x 5m (north block)

Toilet Provision

1 person per 12m2 NIA in relation to WC’s. All toilets unisex.

Cycle Provision

272 cycle spaces

1 Disabled parking space

Lifts

New passenger and fire fighting lifts to be provided within the existing lift shafts

Capacity 100kg for central core lifts and 750kg for the firefighting lifts located on the eastern and western elevations of the southern block

Mechanical and Electrical

Office Design Conditions

Winter 21°C ± 2°C

Summer 24°C ± 2°C

Temperature

Ambient Design Conditions

Winter -4°C dry bulb

Summer 32.5°C dry bulb / 21.5°C wet bulb

Variable Refrigerant Flow system (VRF) sized at 35°C ambient dry bulb

Office Fresh Air Provisions

12 litres per second per person on a 1:10 occupancy

Mechanical services

The space will be mechanically ventilated. Heating and cooling will be provided by VRF fan coil units served from an air source heat pump system

On floor cooling loads 217kW (for levels 3 to 6 excluding landlord areas)

Noise Levels

NR 40 when configured as open plan offices

Electrical Services Provision

Small Power

Cat-A provision of 25W/m2 for small power and 8W/m2 for lighting with additional 10 W/m2 for Local ICT (comms room)

Lighting

Motion-controlled, LED lighting providing 400 lux at the working plane with a uniformity of 0.6

Telecommunications / Data

Telecom and data containment provision will be provided within the landlord core area

Fire Alarm System

An independent fully addressable fire alarm system to L2 minimum standard shall be provided

BMS

All M&E equipment fully controlled by a new BMS installation

Hot & Cold Water Services

Domestic cold water tank sizing for the shell and core and CAT A is based on the BS EN 806-3 and the Plumbing Engineering

Services Design Guide by the Institute of Plumbing

The consumption of potable water within the building will be minimised through the use of low water consumption sanitary appliances, including:

  • Low capacity dual flush toilets
  • Low flow rate showers
  • Low flow rate taps

All water consumption shall be metered and sub-metered per tenant. In addition, sanitary supply shut off and mains leakage detection shall be employed to ensure water wastage is minimised.